Toronto AI Data Center Moratorium & Public Review

2 data centers are being proposed- in Scarborough and Etobicoke. Use this tool to tell the city council to change their motions to a 1-year moratorium on AI data centers in Toronto, which would allow for proper community consultation instead of the rushed job happening now. https://actionnetwork.org/letters/moratorium-comments-toronto/

Vote
Sign in to join the discussion

A six-month moratorium is too slow when Toronto's grid is already strained and AI investment is accelerating elsewhere. We need an emergency interim control bylaw that takes effect immediately while the study runs, not a pause that lets more applications slip through before the rules change.

Vote

This moratorium is essential for equity: low-income and racialized communities in Scarborough and Etobicoke are already bearing the brunt of industrial zoning loopholes. Without public consultation and a cumulative impact study, these data centers will worsen air quality and strain local infrastructure without any community benefit agreement in place.

Vote

Dublin's 2021 moratorium on new data centers worked because they tied it directly to grid capacity assessments and climate targets. Toronto can learn from that: the study must include a transparent threshold for when new connections are allowed, not just a vague 'public review' that produces no binding limits.

Vote

What happens when the six months end and the study says we have no grid capacity left? Then what? A moratorium without a clear off-ramp just kicks the can to a council that's still under developer lobbying pressure.

Vote

Done right, this moratorium unlocks a chance for Toronto to become a global model for smart AI infrastructure planning. We can mandate on-site renewables, waste heat capture for district heating, and grid-responsive operations that actually help stabilize peak demand.

Vote

I hear the urgency from both sides: developers fear uncertainty and communities fear being steamrolled. A 6-month review that includes interim controls, clear criteria, and binding energy efficiency standards could give both groups what they actually need — predictability and protection.

Vote